Go Live
1. Coverage Analysis Proposal
A Submit
Cardiac arrest and overdose data
B Select
Strategic EMS station(s) for installation
C Review
ArcherFRS Coverage Proposal
3. Setup
- ArcherFRS Prepares and submits PAO COA and 91.113(b) Waiver on your behalf
- Archer Survey Analysis performed and Delivery Coordinates established
- Static Obstacles and critical infrastructure are Geo-fenced
- ArcherFRS integration enabled in Radius or Portal
- Activate simulated systems to enable training
4. Installation
- ArcherFRS will install your Ground Control Hubs
- System tests are run to ensure Successful GCH installation
5. Training
- ArcherFRS will enable Simulated aircraft for each of your installations that can be deployed by your dispatchers or call-takers to any 911 call
- Simulator use is encoraged for at least 4 weeks to ensure workflow is fully understood and incorporated into day-to-day dispatch opetaions
- ArcherFRS will provide SOPs and training for Dispatch, on-scene, and reset.
6. Go Live
- Once Training is complete and COA and/or 91.113(b) waivers are approved ArcherFRS will transition the system from simulated aircraft to live aircraft.
- We partner with agencies and hospitals to ensure residents are well-informed and prepared for the introduction of our life-saving drone technology
- System is Live.
- For Fully managed systems, ArcherFRS will perform monthly Maintenance checks on all infrastructure as well as 24/7 proactive and reactive maintenance to ensure System up-time.